18/08/2026
After a job had to be put back this morning due to prep issues we got to the second job of the day early to put in a nice drop of Level plus.
The floors went from 15mm to 40mm in depth meaning Level plus was the best way to go.
Even though this job was less than a meter cube, we will still come out and get it done for you.