J.Williams Plumbing & Heating

J.Williams Plumbing & Heating Providing a professional , friendly and reliable plumbing and heating service throughout the North Wales area, reasonable rates, no job too big or small.

Full bathroom refurbished in dolgarrog by us . Textured brick tiles in the shower area as a feature and 600mm stone effe...
31/10/2021

Full bathroom refurbished in dolgarrog by us . Textured brick tiles in the shower area as a feature and 600mm stone effect tiles elsewhere . Tiles and suite picked out by the client.

Recent bathroom renovation completed in penmaenmawr , stripped out , existing plaster removed , re-boarded , tiled floor...
07/08/2021

Recent bathroom renovation completed in penmaenmawr , stripped out , existing plaster removed , re-boarded , tiled floor to ceiling and new suite fitted . Ofcourse we had to do this during the recent heatwave πŸ₯΅ regardless myself and the customer are happy with the outcome πŸ‘ŒπŸ»

Bathroom refurbishment we completed recently in abergele , multi pannels fitted floor to ceiling , 1700 x 900 low level ...
26/02/2020

Bathroom refurbishment we completed recently in abergele , multi pannels fitted floor to ceiling , 1700 x 900 low level shower tray fitted , matt black towel rail and vanity units . All works completed by us , get in touch for a free estimate πŸ’―πŸ›πŸšΏπŸš½

24/12/2019

We would like to wish everyone a merry Christmas and all the best for the new year . Business as usual from the 6th of January πŸŽ„

Here is some before and afters of a bathroom suite we completed today in colwyn heights . The orignal raised quadrant tr...
13/02/2019

Here is some before and afters of a bathroom suite we completed today in colwyn heights . The orignal raised quadrant tray was removed and a full length low profile tray in its place , along with a floating basin vanity unit and toilet vanity unit . Also the chrome towel warmer was replaced with a matt black towel radiator.

Here are some before and afters of a bathroom we completed this week in conwy . Original bathroom removed , walls studde...
24/08/2018

Here are some before and afters of a bathroom we completed this week in conwy . Original bathroom removed , walls studded out for soundproof insulation and pipework then internal wall cladding fitted ready for the new suite. From start to finish this was achieved in 7 working days . ( window yet yo be replaced and electric's to be 2nd fixed )

Kitchen sink upgrade completed this week in llanrhos.
06/06/2018

Kitchen sink upgrade completed this week in llanrhos.

Bathroom suite we recently completed in deganwy , the orignal bathroom was seperate from the toilet that wall was remove...
30/05/2018

Bathroom suite we recently completed in deganwy , the orignal bathroom was seperate from the toilet that wall was removed and the bathroom was reconfigured to allow for a spacious wet room area . The layout was set out by the customer to make use of the avalible space and it worked out brilliantly. ( Thankyou mick for the after photos )

Bathroom re-fit we completed today in Llandudno Junction , the old shower area had a serious leak so it was removed and ...
19/05/2018

Bathroom re-fit we completed today in Llandudno Junction , the old shower area had a serious leak so it was removed and a bigger tray was installed in its place , all new wall cladding installed along with a new towel rail and rainfall shower.

Here is a thermostatic mixer valve we recently fitted , it mixes the hot and cold together to give you a water temperatu...
16/05/2018

Here is a thermostatic mixer valve we recently fitted , it mixes the hot and cold together to give you a water temperature at the outlet between 38Β°c - 46Β°c ideal for filling swimming pools or even hosing the dog down after a walk , get in touch for a free quote.

Another bath to shower conversion we completed today in conwy , free standing bath removed and a 1200mm tray installed a...
02/05/2018

Another bath to shower conversion we completed today in conwy , free standing bath removed and a 1200mm tray installed along with a rain fall mixer shower , All the works were completed in less than 3 days.

A install we finished today in Llandudno Junction. The client was having difficulty getting out the bath so the bath was...
14/02/2018

A install we finished today in Llandudno Junction. The client was having difficulty getting out the bath so the bath was removed to make way for a low level shower tray , walls stripped of tiles and replaced with plastic cladding then the full length shower screen installed to make her life easier. All the works from start to finish was achieved in less than 3 days.

Address

Llandudno Junction

Opening Hours

Monday 8am - 6pm
Tuesday 8am - 6pm
Wednesday 8am - 6pm
Thursday 8am - 6pm
Friday 8am - 5pm
Saturday 8am - 1pm

Telephone

+447900698117

Website

Alerts

Be the first to know and let us send you an email when J.Williams Plumbing & Heating posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share