04/07/2022
⭐Bathroom Suite completed in Leighton Buzzard⭐
Work carried out:
- Removal of old bathroom suite.
- First fixed pipework in new locations.
- Plastered walls and ceiling.
- Tanked walls ready for tiling.
- Self levelled the floor ready for new lino to be layed.
- New tiling.
- New shower tray with a Aqualux enclosure.
- New thermostatic bar shower with dual head.
- New Ideal Standard close couple toilet.
- New basin vanity unit with a mixer tap.
- New chrome towel radiator.
- New mirror.
- New double wall hung storage unit.
- New light fitting and pull cord.
Before and after pictures 📸
Customer has chosen to paint the bathroom.
Hard work this one but definitely worth it. A lovely end result.
Onto the next one.
👨🏻🔧✅