20/08/2026
Remove existing concrete roof terrace floor, remove existing chimney breast, install new supporting steel beams, tooth in new brickwork, install new timber joists and structural timber ply ready for a warm deck and terrace tiles, on a project like this when you are carrying out works to support the chimney breast you need to install supports from 4 stories down on to a concrete slab at ground level, go to work, put in a shift and all go home safe, job done X