16/10/2026
Beckenham flat roof, part 2 β
This is the section where the old boards had turned to dust (see our video). The roof slopes down to a central gutter. We stripped it right back and removed all the rotten boards and old insulation, then built it back up to Building Regulations standard:
β
New boards
β
Vapour control layer
β
150mm insulation boards
β
Boarded over again
β
Finished in EPDM rubber, including the central gutter
Swipe through to the finished roof π
Get in touch for a free, no-obligation quote.
π https://jbgoodroofing.com