17/10/2026
Natural light and ventilation are so important in a shower room. To realise this one, we unblocked a window which had been walled up, removed abandoned central heating pipes, ran new soil pipes and strengthened structures weakened by previous transformations. We sought and obtained a second listed building consent just for this remediation (the building is Grade II listed).
These pictures by Jflemay are a tribute to the indefatigable main contractor Woodsgift Interiors & Joinery who sorted these issues and then implemented C.P. Hart ’s design with our general direction. The client selected a warm grey Appennino marble complemented by Dornbracht taps.
All photographs © Jflemay Architecture and Design RIBA, 2026