Bas Frames

Bas Frames Established in 2010, BAS Frames is a trusted subcontractor for structural steel projects.

We combine engineering expertise with precise installation to deliver high-quality residential and commercial builds. πŸ‘·β€β™‚οΈπŸ‡¬πŸ‡§

A pitched roof β€” built entirely in steel. πŸ—οΈThrowback to Block B, Grays Place, Slough: 5 storeys of SFS and structural s...
18/08/2026

A pitched roof β€” built entirely in steel. πŸ—οΈ

Throwback to Block B, Grays Place, Slough: 5 storeys of SFS and structural steel, topped by a stick-built steel pitched roof where every dormer window was set out and formed individually. No standard units β€” and unlike timber, a steel dormer has to be right first time.

And the part main contractors like most: the whole building went up with a telehandler alone. No tower crane, no mobile crane, no street closures. That saving went straight to the project budget.

βœ… Client: 4Square
βœ… Partner: Steel Frame Systems
βœ… 5 storeys | 14 weeks | 2018
βœ… Only lifting plant on site: 1 telehandler

Full project story πŸ‘‰ https://basframes.co.uk/project/block-b-slough/

Need a pitched roof or dormers in steel? Send us your drawings.
πŸ“ž 07463 631303 | βœ‰οΈ [email protected]

A 5-storey SFS and structural steel build at Grays Place, Slough, topped by a stick-built steel pitched roof with bespoke dormers. 14 weeks, 2018.

Project Spotlight β€” 56 Chatfield Road, Wandsworth SW11A look back at one of the projects we're proud to have delivered.T...
12/08/2026

Project Spotlight β€” 56 Chatfield Road, Wandsworth SW11

A look back at one of the projects we're proud to have delivered.

The brief from Landmark Estates was a demanding one: add four new storeys to an existing riverside building on the Thames β€” without rebuilding foundations that were designed for a smaller structure.

Our solution was a light gauge steel frame using the Frameclad system, engineered to carry the significantly increased structural loads and wind forces of a vertical extension. From start to finish, the project was completed in just 10 weeks.

What made this project a strong example of how we work wasn't only the build itself β€” it was the problem-solving along the way:

The architectural drawings we received were incomplete, referencing manufacturer standards rather than project-specific details. We filled the gaps using our deep familiarity with the Frameclad system.

On our very first site visit, we identified a scaffold tie clash with the structural steel encasement β€” a problem that would have caused costly delays and rework had it been found mid-installation.

When communication between the architect and steel supplier stalled, our team personally measured every floor and produced the cutting lists ourselves, at no extra cost, to keep the project moving.

The outcome was on-time delivery, costs avoided through early problem detection, and seamless coordination from start to finish.

This is the kind of work we do every day β€” and the BAS Frames difference. We don't just install steel frames; we protect our clients' timelines and budgets at every stage.

πŸ“© Planning a vertical extension or a light gauge steel frame project? Get in touch β€” we'd be glad to help.
https://basframes.co.uk/project/chatfield-road/

Project Spotlight: Fulham Depot, Imperial Road, LondonEvery project brings its own challengesβ€”and the Fulham Depot devel...
03/08/2026

Project Spotlight: Fulham Depot, Imperial Road, London

Every project brings its own challengesβ€”and the Fulham Depot development was no exception.

Built on the site of a former gas depot, this project demanded exceptional technical expertise, close collaboration, and uncompromising attention to fire safety. Working alongside Erith and Atkins, our team designed, supplied, and installed the Steel Frame System (SFS) infill, meeting demanding 120-minute fire resistance requirements through carefully engineered solutions and specialist installation techniques.

From design coordination to on-site ex*****on, every detail was delivered with precision, ensuring full compliance while keeping the project on programme.

At BAS Frames, we're proud to help transform complex engineering challenges into successful, high-quality construction projects.

πŸ“ Fulham Depot, Imperial Road, London

Discover the full case study:
https://basframes.co.uk/project/fulham-depot/

, , , , , , , , , , ,

BAS Frames delivered a Fulham GAS Depot project for Erith, achieving a complex 120-minute fire-rating. Installed SFS infill and Promat board after specialist training, resulting in a repeat client.

28/07/2026

πŸ—οΈ **Project Showcase | Albany Court, London**

We're proud to present the successful completion of **Albany Court**, a challenging rooftop extension delivered using our **Steel Frame Systems (SFS) Stick-Build** solution.

This project involved the construction of **six new residential flats** above an occupied building, where careful planning, precision, and close collaboration were essential from day one.

Despite restricted site access, a narrow residential street, and the need to coordinate every material delivery to Level 5, our team completed the project safely and efficiently without disrupting the residents below.

One of the most technically demanding aspects was the bespoke multi-level roof structure, incorporating custom steel dormer windows and three stepped roof levels. Working closely with the design consultants, our site team successfully resolved complex design challenges throughout the build while maintaining programme and quality.

Projects like Albany Court demonstrate what can be achieved through expert planning, skilled workmanship, and strong collaboration.

A huge thank you to everyone involved for their dedication and professionalism.

Discover the full project here:
https://basframes.co.uk/project/albany-court-new/

🚧 Project Spotlight: Cross Keys Rooftop Extension πŸ—οΈWe're proud to showcase one of our most technically demanding projec...
20/07/2026

🚧 Project Spotlight: Cross Keys Rooftop Extension πŸ—οΈ

We're proud to showcase one of our most technically demanding projects to date – the Cross Keys rooftop extension in Edmonton.

Working with Forts Group, BAS Frames successfully delivered a steel frame structure for 8 new flats above an occupied six-storey residential building. This bespoke project featured:
βœ… A complex tiered roof design
βœ… Precision-cut steel joists tailored to unique angles
βœ… Manual installation of joists up to 6 metres long
βœ… Construction carried out while residents remained in the building below

Projects like this demonstrate our team's ability to overcome complex engineering challenges while maintaining the highest standards of safety, quality, and precision.

A huge thank you to everyone involved for their dedication and expertise! πŸ‘

Take a closer look at the project here:
https://basframes.co.uk/project/cross-keys-new/

BAS Frames delivered a complex 8-flat high-rise rooftop extension with a tiered roof design for Forts Group. Achieved manual 7m lifts under strict resident occupancy conditions, showcasing technical expertise.

09/07/2026

A great milestone for the BAS Frames team as the first delivery for our latest project arrived on site yesterday.

This exciting 6-storey infill development on Harrow High Street marks the beginning of another high-quality steel frame project for one of our valued clients from China. After months of planning, design, and coordination, it's fantastic to see the project officially move from pre-construction into the build phase.

A huge thank you to our client, our design and manufacturing partners FRAMECLAD LIMITED, and everyone involved in making this possible. Strong collaboration and careful planning have laid the foundation for a smooth start, and we're looking forward to seeing the structure take shape over the coming weeks.

We'll be sharing regular progress updates as the project develops.

At BAS Frames, we're proud to deliver reliable, high-quality steel frame solutions through expert planning, strong partnerships, and efficient project delivery.

πŸ—οΈ Panellised vs Stick Build SFS – Which Steel Frame System Is Right for Your Project?Choosing the right Steel Framing S...
06/07/2026

πŸ—οΈ Panellised vs Stick Build SFS – Which Steel Frame System Is Right for Your Project?

Choosing the right Steel Framing System (SFS) can make a significant difference to your project's speed, cost, and efficiency.

βœ… Panellised SFS
β€’ Factory-manufactured for maximum precision
β€’ Faster on-site installation
β€’ Reduced labour and programme time
β€’ Ideal for large-scale and time-sensitive developments

βœ… Stick Build SFS
β€’ Assembled on-site for greater flexibility
β€’ Perfect for complex designs and restricted-access sites
β€’ Excellent for bespoke builds and rooftop extensions
β€’ Easily adapts to changing site conditions

At BAS Frames, we deliver both systems, helping developers and contractors select the most efficient solution for every project. Whether your priority is speed or flexibility, our experienced team can provide the right approach from design through to installation.

Read our full comparison here:
https://basframes.co.uk/basframes-co-uk-panellised-vs-stick-build-sfs/

πŸ“ž Get in touch to discuss your next steel frame project.

Modular steel frame construction in the UK: panellised vs volumetric, programme savings, cost equation, BTR and HRB applications. 2026 developer's guide.

02/07/2026

We are taking this project to the next level with a massive two-storey rooftop extension, powered by a pre-panelised Light Gauge Steel frame system. πŸš€πŸ”©

Working right next to active railway lines? No problem. πŸš„ Thanks to careful planning, top-tier site management, and incredible teamwork, we are making serious moves on site!

Massive shoutout to Andy Tichy and FRAMECLAD LIMITED for putting BAS Constructions forward for this and for the epic support along the way. 🀝

Hit follow to watch this rooftop transform! πŸ‘‡βœ¨

Choosing the right SFS subcontractor can make or break your project. πŸ—οΈWhen selecting a Steel Frame System (SFS) subcont...
29/06/2026

Choosing the right SFS subcontractor can make or break your project. πŸ—οΈ

When selecting a Steel Frame System (SFS) subcontractor, don't just compare prices. Look for a partner with proven experience, strong technical expertise, reliable project management, and a commitment to quality and safety.

A trusted SFS specialist should offer:
βœ… Proven experience on similar projects
βœ… Design, supply, and installation expertise
βœ… Clear communication throughout the build
βœ… Compliance with UK standards and regulations
βœ… A track record of delivering projects on time and within budget

The right subcontractor helps minimise delays, reduce risk, and ensure your project runs smoothly from start to finish.

Read our latest guide to discover the key factors you should consider before making your decision.

πŸ‘‰ https://basframes.co.uk/how-to-choose-sfs-subcontractor/

Address

35 Redcliffe Close
London
SW59HY

Alerts

Be the first to know and let us send you an email when Bas Frames posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Featured

Share