03/06/2026
One of our most challenging jobs, but we got there in the end! This bathroom originally had a leaking bath and toilet which rotted the joists. The floor needed replacing, then we moved the pipework to accomodate a shower tray and cubicle. new toilet, wall hung vanity and radiator. All pipework was replaced and discreetly hidden in the walls and floor. The window was staying the same size, so we fitted an acrylic panel for waterproofing. All finished off with wet wall panels ready for flooring, then the new tenant.