20/06/2026
This project had been planned for some time, with the client waiting until the main house build was nearing completion before progressing with the external works.
Works commenced 10 days ago with site clearance and excavation. Using a 1-tonne excavator, we removed the existing made ground, consisting of hardcore and imported fill that had previously been used to raise site levels. Approximately 300mm (12 inches) of material was excavated across an area of around 70m² and removed from site via grab lorry.
Following excavation, foundations were installed for a new retaining structure. Once cured, the retaining wall was constructed to establish and maintain the required finished levels throughout the garden.
The sub-base build-up then commenced, with approximately 20 tonnes of MOT Type 1 and clean drainage stone imported, spread and compacted in layers to provide a stable, free-draining foundation for the paving works.
The client supplied 70m² of Kandla Grey Smooth Sandstone, which was laid to the new patio areas on a full mortar bed, with levels and falls carefully set to ensure effective surface water management and compliance with best practice installation methods.
Additional works included the construction of a reinforced concrete base to accommodate a future hot tub installation, designed to provide adequate load-bearing capacity for the intended use.
To complete the project, approximately 70m² of quality turf was laid, creating a seamless transition between the paved areas and the lawn.
Overall, the project involved significant excavation, level reduction, retaining works, sub-base installation, paving, concrete works and landscaping to transform what was previously a raised, unfinished area into a practical and aesthetically pleasing outdoor space.
Special thanks to Darren and Graham at Severnside Sand and Aggregates for the digger and the endless trips in with aggregate and Daves bricklaying projects for giving us a week of his time to help us.