Edwards Contractors

Edwards Contractors Contact information, map and directions, contact form, opening hours, services, ratings, photos, videos and announcements from Edwards Contractors, Electrician, Bacon Hall Farm, Eaton Upon Tern, Market Drayton.

Plumbing, Heating, Renewables & Electrical
Phone - 01952 541238
or
Russell (Plumbing) - 07815772172
Luke (Electrician) - 07805572902

A return to a customer which we installed a .uk ASHP for, one of the first under the BUS scheme and their system now has...
20/11/2025

A return to a customer which we installed a .uk ASHP for, one of the first under the BUS scheme and their system now has been running a dream since completion. We have now installed a 9.45kW solar array with a .uk 7.5kW hybrid inverter and a .uk battery stacker system, giving the customer the option to expand easily in the future. Currently installed is 3 x 3.6kWh batteries. Also a consumer unit upgrade was carried out and I’ll completed in 2 days. The whole system was designed in house by ♻️

.uk newest recruit, Floss 🐶
07/02/2025

.uk newest recruit, Floss 🐶

51 x 435W  panels laid in a day and half 3 x strings of 17 panels read to wire back to the  inverter position. Starting ...
23/07/2024

51 x 435W panels laid in a day and half 3 x strings of 17 panels read to wire back to the inverter position. Starting the other roof tomorrow with another 51 panels 💪🏻 hopefully powered up by Friday and commissioning on the Monday.

Nice .uk delivery today ready to install in the next coming weeks, all on different projects.
25/04/2024

Nice .uk delivery today ready to install in the next coming weeks, all on different projects.

Jobs completed this week…. Monday and Tuesday we completed the roof works in Telford with a 19 x  415W panels installed ...
11/01/2024

Jobs completed this week….
Monday and Tuesday we completed the roof works in Telford with a 19 x 415W panels installed using a GSE integrated in roof mounting system. This array will be connected to a X3 G4 8kW hybrid inverter with 2 x 5.8kwh batteries. Today was a second visit to our Rochdale site to relocate the customers EVC supply into the gateway and connect it onto the grid side. Connection this way will stop the battery charging the EV if the customer was needing to top up his car battery during on peak times. We also installed and relocated a new consumer unit.

Fully completed and commissioned our first  Solar PV system yesterday. 23 x 430W  panels 11 on the south on one string a...
07/11/2023

Fully completed and commissioned our first Solar PV system yesterday. 23 x 430W panels 11 on the south on one string and 12 on the west on another string. All panels having Tigo optimisers to help with the performance. Gen3 5kW hybrid inverter along with 3 x 9.5kWh battery storage. Both the Givenergy and Tigo are on the online cloud system for monitoring purposes. Very happy customer!

Phase 1 of our first Givenergy Solar job. 5kW hybrid inverter with 3 x 9.5kWh batteries, Tigo optimisers going onto the ...
20/10/2023

Phase 1 of our first Givenergy Solar job. 5kW hybrid inverter with 3 x 9.5kWh batteries, Tigo optimisers going onto the panels which will be installed in a couple of weeks.

Take a look at our new van graphics 👀 😎 ☀️ ♻️ 🔋 (Ft Floss 🐶)
20/07/2023

Take a look at our new van graphics 👀 😎 ☀️ ♻️ 🔋
(Ft Floss 🐶)

We as a company are over the moon with our recently completed largest solar PV installation we have undertaken at a larg...
14/06/2023

We as a company are over the moon with our recently completed largest solar PV installation we have undertaken at a large diary farm. This completed installation has been fully designed, installed and commissioned by 5 strings of 90 x 405W panels sitting on a rail system. All wired back to a 30kW 3 phase inverter, coupled up with a chint meter for full monitoring of the PV production and the farm electricity consumption which can all be monitored remotely by us or by the customer on the SolaX cloud system. 👌🏻 ☀️ ♻️

We have now passed our initial assessment from MCS for the design, installation and sign off for installing battery stor...
16/05/2023

We have now passed our initial assessment from MCS for the design, installation and sign off for installing battery storage systems. This meaning we are a MCS Certified company to install Solar Photovoltaics, air and ground source heat pumps and battery storage. 🔋 ♻️ ☀️

Address

Bacon Hall Farm, Eaton Upon Tern
Market Drayton
TF92BX

Opening Hours

Monday 7am - 4pm
Tuesday 7am - 4pm
Wednesday 7am - 4pm
Thursday 7am - 4pm
Friday 7am - 4pm

Telephone

+441952541238

Alerts

Be the first to know and let us send you an email when Edwards Contractors posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share

Category