SR Building Solutions

SR Building Solutions Our construction experts are dedicated to completing your project (large or small)

SR Building Solutions were pleased to hand over this completely refurbished toilet block to Vale Of Glamorgan Council to...
20/01/2026

SR Building Solutions were pleased to hand over this completely refurbished toilet block to Vale Of Glamorgan Council today at Cosmeston Country Park.
Complete toilet refurbishment including mechanical, electrical, solar, new slate roof.

13/01/2026

We are looking for a carpenter for an immediate start. Competitive rates of pay. Call 07815061164 to discuss.

30/11/2024
SR Buildings solutions are currently looking to recruit a reliable decorator to join our team on a full time basis. We h...
30/11/2023

SR Buildings solutions are currently looking to recruit a reliable decorator to join our team on a full time basis. We have secured long term contracts through out South Wales.
Rates of pay are negotiable depending on experience.
If interested, reply to via FB or contact 01685 700668

All done and dusted on our double extension project we’ve worked on over the last year in Cefn Coed! This has been a cha...
26/08/2022

All done and dusted on our double extension project we’ve worked on over the last year in Cefn Coed!

This has been a challenging build at times but all in all it was a pleasure to see it all come together and to see the finished article!

Big Thank You to Gavin and Bethan for trusting us with their build!

2 WEEK SHUT DOWN REFURBISHMENT COMPLETE!We’ve been flat out the last 2 weeks refurbishing the Ground and Second floor of...
22/07/2022

2 WEEK SHUT DOWN REFURBISHMENT COMPLETE!

We’ve been flat out the last 2 weeks refurbishing the Ground and Second floor of the Theatr Brycheiniog in Brecon!

It was a mammoth task but today we handed the building back over ready for furnishing for their re-opening tomorrow.

Works included:
Full strip out of the ground floor and second floor - ceilings, reception desk, floors, walls etc.

800m2 of Decoration to walls, ceilings and woodwork

500m2 of New Vinyl Tile Flooring

Boarding and Skimming 200m2 of Ceilings

Electrical Works and New Lighting installations

Carpentry Works including new worktops, shelving, partitions and doors

Another job completed in a tight timeframe and to a high standard 👍🏻👌

Phase 2 of our internal refurbishment at Theatr Brycheiniog is underwayInternal strip outNewly boarded and skimmed ceili...
30/06/2022

Phase 2 of our internal refurbishment at Theatr Brycheiniog is underway

Internal strip out
Newly boarded and skimmed ceilings
Full M&E works
500m2 of new LVT flooring to be laid
New reception desk to be constructed
Full decoration throughout

26/05/2022

Currently recruiting external operatives:

Groundworkers

Fencers

Skilled Labourers

Contracts secured for the next 7 years with an ever growing client base. All works within a 1 hour travel time or less from Merthyr Tydfil.

Looking for operatives on the books or on a self employed basis. Company benefits include company van option, fuel card and uniform.

Feel free to get in touch for more information or to express your interest.

Forgot to post photos of this extension now fully completed in Cefn Coed!There was a lot of steel and a lot of stone tha...
19/01/2022

Forgot to post photos of this extension now fully completed in Cefn Coed!

There was a lot of steel and a lot of stone that went into this one! 😅 we’re well pleased with the outcome!

Gavin and Beth have been brilliant clients and we’re looking forward to making a start on the next phase on the other side of the house 👍🏻

Nice little job carried out over the last few weeks, with the inception of the site being the last week before Christmas...
19/01/2022

Nice little job carried out over the last few weeks, with the inception of the site being the last week before Christmas, we had a real challenge on our hands to get this floor ready before the deadline.

- Full rip out works
- New oak faced bar installed
- Concrete effect tiles laid as new countertop
- New spotlights installed throughout
- Bespoke drinks lockers installed
- Decorated all existing surfaces approx. 500m2 and skirtings
- Prepare floors and lay new LVT flooring approx 200m2

Just the flooring to go down and a final clean ready for handover on Monday 👍🏻 great work by the team and our subbies!

Lovely project we have on the go at Merthyr College transforming this run down communal area into a retreat for the ILS ...
12/10/2021

Lovely project we have on the go at Merthyr College transforming this run down communal area into a retreat for the ILS students.

Works involved;

Removal of existing slabbing and planters✔️
Excavating to reduced levels and stoning up✔️
20m2 concrete base installed✔️
72m2 of EPDM soft playground surfacing installed✔️
15m of V mesh security fencing and gate installed✔️
10m2 of slabbing and path edgings to creat new path✔️
New bespoke timber cabin installed✔️

Some progress photos of our private job at The Fairways, Cefn CoedStructural steel is now all installed and the blockwor...
02/09/2021

Some progress photos of our private job at The Fairways, Cefn Coed

Structural steel is now all installed and the blockwork is on its way up.

Gearing up ready for the stonework to commence 👍🏻

Address

The Old Six Bells Inn
Merthyr Tydfil
CF481RP

Opening Hours

Monday 8am - 5pm
Tuesday 8am - 5pm
Wednesday 8am - 5pm
Thursday 8am - 5pm
Friday 8am - 5pm

Telephone

+441685700668

Alerts

Be the first to know and let us send you an email when SR Building Solutions posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to SR Building Solutions:

Share