01/09/2026
π« 138mΒ² EPDM Rubber Roof β Local School Project Completed
Another project successfully completed by the team at Raynes β
We recently completed a 138mΒ² EPDM rubber roofing system on a local school, transforming the existing concrete roof with a complete upgrade.
π¨ Works included:
β’ Battened out over the existing concrete roof
β’ Installed new 18mm OSB boards
β’ Removed the existing dormer/skylights
β’ Reframed openings using 6x2 timbers
β’ Installed new windows
β’ New fascia and guttering
β’ Installed new 6-inch Code 4 leadwork
β’ Finished with a fully bonded EPDM rubber roofing system
A full roof transformation designed to provide a durable, watertight and long-lasting finish for the school.
Another quality job completed by Raynes β from preparation right through to the final finish. πͺ
π Local work. Quality workmanship. Built to last.