McGregor Structures

McGregor Structures McGregor Structures is a leading manufacturer of tensile fabric structures We deliver across Europe!

We manufacture and design reinforced PVC sheets and covers on site, where we have a team of engineers that specialise in fabric structures and PVC fabric manufacturing. We have developed bespoke buildings and products; from salt barns to aircraft hangars. Expertly understanding the nature of the material is vital to creating the best product possible. With guidance from the customer we are able to

design and create a bespoke product. Our design team uses the latest software to calculate and draw up the right design.

With the bank holiday only a few days away, most logistics and distribution sites are already adjusting schedules to abs...
27/08/2026

With the bank holiday only a few days away, most logistics and distribution sites are already adjusting schedules to absorb the gap.

A shorter week compresses the same yard workload into less time. When storage is exposed or loading bays are uncovered, that pressure lands harder than usual and leaves less room to manage around it.

The good news is that most container yards already have what they need to fix it. Shield mounts directly to the ISO containers already on site, needs no groundworks, and is typically operational within 48 hours of delivery.

If covering part of your yard has been on the list, get in touch with the McGregor Structures team.
https://mcgregorstructures.com/contact/

The 1st October deadline is only five weeks away.From that date, every permitted waste receiving site in England and Wal...
24/08/2026

The 1st October deadline is only five weeks away.

From that date, every permitted waste receiving site in England and Wales must log every load received on DEFRA's Digital Waste Tracking Service. Paper Waste Transfer Notes are gone from that date, with no grace period for sites that are not yet compliant.

Most sites are working through the software side right now, getting registered and training weighbridge staff. The physical yard tends to come up later.

DEFRA's system gives regulators a live view of what is arriving at your site, in what condition, and how it is being handled. Sites with covered separation bays and dry, organised storage are well placed when that level of visibility comes in.

Most logistics sites calculate the cost of a cover by the unit price.Replace a temporary cover every three to five years...
21/08/2026

Most logistics sites calculate the cost of a cover by the unit price.

Replace a temporary cover every three to five years, and over 15 years, you have paid for the same square footage of the roof three times over. Each replacement brings removal costs, downtime while the yard is exposed, and in some cases an insurance excess if a failure caused damage along the way. A lot of facilities managers reach that third replacement before they hit the full number.

The more useful question before the next purchase order is what covering this part of the site will actually cost over 15 years, and what the most efficient route to get there looks like.

If that calculation is worth running before the next budget cycle, we are happy to talk it through.

https://mcgregorstructures.com/contact/

19/08/2026

James Kemball is a container service provider offering cargo handling, long-term storage, and logistics solutions to their clients. When their customers started asking for undercover storage, they went looking for something that would fit the operation and set them apart.

McGregor Structures built and installed a Shield Canopy tailored to their site.

Paul Mitchell, their Commercial Lead, explains what happened next.

"As soon as it was up, we were ready to put cargo in there."

The Shield Canopy was installed and operational the same day

Since installation, the interest has spread further than they anticipated, with existing customers, new customers, and even competitors taking notice.

"Even our competition have shown an interest."

PJ Skips needed to cover separation bays without stopping the site.Harriet Hamer, their Operations Director, had worked ...
12/08/2026

PJ Skips needed to cover separation bays without stopping the site.

Harriet Hamer, their Operations Director, had worked with McGregor Structures before. When the requirement came up to cover their existing concrete block bays and meet Environment Agency specifications, she gave us a call.

Opus connected to the Legato blocks already in place, no groundworks were required, and the installation was complete in two days with the site still running throughout. The results were immediate, less manual handling, lower transport costs from drier processed material, and more usable space across the site.

Harriet summed it up:
"The site management has improved enormously with the Opus structure, it enables us to maximise the space on site. It's provided us with the best possible ROI in the shortest period of time. We're super happy with the service provided by McGregor Structures."

Read the full PJ Skips case study: https://mcgregorstructures.com/projects-old/pj-skips/

RWM Expo is one month away, and it is returning to the NEC Birmingham on 16-17 September.It is the UK's biggest event fo...
11/08/2026

RWM Expo is one month away, and it is returning to the NEC Birmingham on 16-17 September.

It is the UK's biggest event for the recycling and waste management sector. This year, it lands just weeks before the Digital Waste Tracking deadline in October, which means the conversations happening will be more operational than usual. Sites are thinking about what needs to be in order before the deadline hits.

Alasdair McGregor, our founder, will be there. If you are attending and want to talk through site infrastructure or how Opus works on recycling and waste transfer sites, get in touch before the event.

Register for free tickets to RWM Expo 2026: https://www.ess-expo.co.uk/rwm

Today is the first Vocational Celebration Day in the UK.Created to recognise people who build their careers through tech...
06/08/2026

Today is the first Vocational Celebration Day in the UK.

Created to recognise people who build their careers through technical and vocational routes.

Every McGregor Structures build starts on our factory floors in Hampshire. Many of the people behind it came up through apprenticeships and technical training:
→ Steel fabrication
→ Membrane cutting and fitting
→ Frame assembly
→ Comprehensive quality checks

The quality of what arrives on a quarry site, a MOD base, or a recycling facility depends directly on the people who built it. Their skills are in every structure we deliver.

To everyone at McGregor Structures who builds the product, today is for you.

The Defence Investment Plan published on 30 June commits £22.7 billion to the defence estate over the next four years.Ni...
05/08/2026

The Defence Investment Plan published on 30 June commits £22.7 billion to the defence estate over the next four years.

Nine in ten MOD properties are flagged for improvement. Three in ten, around 14,000, need significant work or a full rebuild. For estates teams, the direction is clear, and the funding is the most significant commitment to defence infrastructure in a generation.

Turning that commitment into completed infrastructure takes time. Procurement cycles, planning, groundworks, the longer programme will deliver, but some requirements on the ground move faster with a different approach.

McGregor Structures has been supplying the MOD since 1996. For sites that need covered workspace, welfare facilities, or maintenance shelters in place quickly:
→ No groundworks required
→ No planning permission in most cases
→ Stock held across our UK and European hubs
→ On site within days of an order being confirmed

Most site infrastructure decisions that need to be in place by August are already a few weeks behind.July is typically w...
31/07/2026

Most site infrastructure decisions that need to be in place by August are already a few weeks behind.

July is typically when construction sites, aggregate operations, and distribution yards ramp up their summer programmes. The groundworks are done, volumes are up, and any gaps in covered storage or workspace become visible quickly.

The structures that close those gaps fastest are the ones that can be deployed in a matter of hours, not weeks.

Shield installs in 48 hours, mounting directly to ISO containers already on site with no groundworks required.

Opus connects to the Legato blocks that most aggregate and recycling sites have in place, with no specialist foundation work.

Both are stocked in the UK and our European hubs, and can be on site within days of an order being confirmed.

If there's a gap on your site that needs covering before Q3 is in full swing, now is the right time to talk through options.

Get in touch with the McGregor Structures team https://mcgregorstructures.com/contact/

Recently, we completed a troop shelter project for a defence training facility.The project involved the delivery of a Sh...
30/07/2026

Recently, we completed a troop shelter project for a defence training facility.

The project involved the delivery of a Shield troop shelter, with the McGregor Structures team working closely with the client throughout, responding to requirements as they developed and maintaining progress against programme milestones. The result was a facility completed within the agreed timeframe and below the approved budget, meeting the required quality standards throughout.

Mr. Castle, Project Lead, wrote to us on completion:

"The facility is now operational and is providing immediate health, safety, and welfare benefits to our people. The standard of workmanship and finish reflects positively on all parties involved and represents a durable, high-quality asset that will support training activity over the long term."

The client also noted they look forward to future opportunities for continued collaboration. For McGregor Structures, that's the measure of a project well delivered.

Details on the Shield range are in the comments.

Address

Winton Farm, Petersfield Road
New Alresford
SO240HB

Opening Hours

Monday 8am - 5:30pm
Tuesday 8am - 5:30pm
Wednesday 8am - 5:30pm
Thursday 8am - 5:30pm
Friday 8am - 5:30pm

Alerts

Be the first to know and let us send you an email when McGregor Structures posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to McGregor Structures:

Shortcuts

Share