03/02/2026
Bathroom Renovation – Complete ✨
We recently completed this full bathroom renovation, transforming an old and tired space into a clean, modern and highly functional bathroom tailored exactly to the customer’s vision.
The original bathroom suffered from a non-working electric shower, wasted space at the end of the shower area, and an overall layout that no longer worked practically or safely. The aim was to create a more refined, usable space while maximising every inch of the room.
During the strip-out stage, it became clear that one wall was significantly out of level. This was taken back to bare and carefully rebuilt to ensure a perfectly straight, clean finish before any tiling work began.
This project took approximately three weeks to complete, allowing the time needed to focus on the finer details and ensure the finished bathroom matched exactly what the customer had envisioned.
Works carried out included:
• Full strip-out of the existing bathroom
• One wall taken back to bare and reworked due to severe unevenness
• Removal of the old electric shower
• Installation of two new vanity units
• Installation of a close coupled toilet
• Installation of the basin
• Installation of a 1200mm shower tray with fixed shower screen
• Fitting of a bar mixer rainfall shower
• Updated towel rail
• Full tiling and trim throughout the bathroom, including neatly tiling around the existing gas box to maintain a clean, cohesive finish
The bathroom was designed by the customer, and we worked closely with her throughout to ensure the layout, finishes and functionality all came together exactly as planned.