03/09/2026
Full bathroom Renovation in Stonesfield.
Stripped all panelling off the walls and flooring. Removed a Non-structural wall deviding 2 rooms to make an open plan and blocked up existing door way leading to one of the rooms. New radiator installed and tiling with masaek detailing. New Interior door fitted and architraves skirting with new floor laid.