Tank, base and stand installation completed in Cambridgeshire.
We replaced this badly corroded single skin steel tank with a bunded 1400 litre plastic tank.
The block piers supporting the old tank were sinking. We removed and disposed of the piers and replaced them with a cast concrete slab pad.
The to get the required height for the boiler and Aga the new tank was placed on a bespoke made steel stand.
We also supplied a temporary tank whilst the construction work was completed.