11/08/2026
Recent completion of a 1,450m² tanker haulage yard, fully designed, supplied and installed.
The project included:
• Installation of over 350m³ of concrete
• Eight floodlights supplied and installed for maximum nighttime visibility
• A fully comprehensive and compliant drainage system
• Oil interceptor tank installed to meet current environmental regulations
A complete turnkey package, delivered from the initial design through to final installation.