A thoughtful refurbishment that makes every part of the building serve for its community better.
CFD Architects progressed RIBA workstages 0 – 6. From planning, technical design and production information, to contract administration and handover.
The project involved replacing the old and inaccessible toilet block. The extension provided a new lobby area and a more accessible levelled toilet block. The extension meets current regulations with improved thermal efficiency to both existing and new elements.
Prior to planning a schedule of works was provided outlining the remedial and repair works required.
The painted finish uplifts the existing tired looking render finish, better situated to its area.
The result, a more welcoming, practical and energy-efficient place for everyone.