31/10/2026
How long does a heat pump installation take?
On a bungalow this size, usually three to five days. This one is likely to run to four or five because of the microbore pipework we've found in the loft, which we're disconnecting and renewing as we go.
Every property is different, which is why we give you a timescale after the heat loss assessment rather than before it.
MCS certified | Shrewsbury and Shropshire | Mid Wales