18/08/2026
Shropshire structure. Seamlessly supplied.
We thrive on solving complex access challenges for communities and industries alike.
Our latest case study explores the MEJ Footbridge project in Oswestry, Shropshire, where we supplied and installed a new pedestrian bridge, built for the local community.
🔹 The Challenge
The project required installing a modern pedestrian footbridge over the A5 road in Oswestry.
Installing a bridge over the A5 in Oswestry (one of Shropshire's busiest and most heavily trafficked routes) required operating within tight, pre-agreed closures to meet strict National Highways standards. With this in mind, our teams delivered precision lifting and seamless traffic management to keep disruption to an absolute minimum.
🔹 The Solution
We deployed our turnkey supply and installation to keep everything on track.
Working to the client's design, our workshop teams fabricated the robust steel footbridge sections offsite to guarantee quality control and streamline the program.
Our specialist transport and lifting teams then carefully coordinated the logistics alongside National Highways stakeholders, using precision crane manoeuvres to drop the pre-engineered structure perfectly onto its foundations.
🔹 The Results
The new footbridge was installed flawlessly and safely, meeting all compliance standards and safety benchmarks.
This durable, low-maintenance structure now provides a secure and accessible crossing over one of Shropshire's busiest roads, future-proofing the local pedestrian network and standing as a testament to efficient, off-site manufacturing.
Read the full technical spec: https://lnkd.in/dp-7RaJR