10/09/2025
π§±π§± so we've been busy with the extension. We got the pipes shuttered up and the footing poured βοΈ next up we got the building set out and the Trench blocks laid, brickwork down and the build up on the inside to dpc height bridgeing the drains with concrete lintelsβοΈπ₯ next up for us is to move the manhole and drainage and prep the floor slab ready to be inspected by the building inspector π₯πͺ liking the way this one is taking shape π― keep your eyes peeled for the next phase of the build! Anyone after that extra living space, extension, Garden wall or just that little patch up job give us a call π 07837688430 for a free no obligation quote