Southern Carpentry Group

Southern Carpentry Group SCG - Commercial Carpentry contractors

Completed refurbishment of four washrooms, a fully accessible disabled changing and shower facility, along with corridor...
17/03/2026

Completed refurbishment of four washrooms, a fully accessible disabled changing and shower facility, along with corridor redecoration and installation of new doors, delivered to a high standard, on time and ready for use. 🌟

Southern Carpentry Group are excited to announce our intergration with  the industry-leading building compliance softwar...
06/01/2026

Southern Carpentry Group are excited to announce our intergration with the industry-leading building compliance software provider.

SCG will be using this system for our fire door installations, maintenance, and fire stopping works, ensuring full compliance, transparency, and the highest safety standards on every project đŸ”„đŸšȘ❌

For all enquiries, please email us on [email protected] or DM us!

We’re currently on site at Milford House, Wi******er, carrying out important annual fire door maintenance on behalf of W...
19/10/2025

We’re currently on site at Milford House, Wi******er, carrying out important annual fire door maintenance on behalf of Wi******er City Council.

Our team is ensuring all doors are fully compliant, safe, and operating exactly as they should, vital work that helps maintain the safety and integrity of the building for all its occupants.

We’re pleased to report that works are progressing smoothly and are on track for completion on schedule.Â đŸ‘·â€â™‚ïžđŸ’Ș

It’s always great to see our team’s professionalism and attention to detail shine through on essential projects like this.

******erCityCouncil

We’re proud to share our recent installation work at Eastleigh College, where our team handled the full fit-out of the k...
19/10/2025

We’re proud to share our recent installation work at Eastleigh College, where our team handled the full fit-out of the kitchen base units, wall units, worktops, sink cutouts, and upstands throughout the dental training suite.

It’s always rewarding to see our craftsmanship come together in such a clean, high-spec environment, and we have to say, we’re seriously impressed by the technology and facilities colleges have these days
 including that incredible dentist chair setup! đŸȘ„đŸ’ș

A big thank you to it’s great to be part of creating spaces that inspire learning and hands-on experience.

At Southern Carpentry Group (SCG), we take pride in delivering complete, high-quality installations that blend technical...
14/10/2025

At Southern Carpentry Group (SCG), we take pride in delivering complete, high-quality installations that blend technical precision with visual craftsmanship, and this recent heating system installation is a perfect example of that.

Collaboration sits at the heart of every great project.
For this award-winning heating installation, Nu-Heat Underfloor Heating & Renewables provided the technical design and supply; MPK Plumbing & Gas Services Limited executed the installation to an incredible standard; and Southern Carpentry Group managed and coordinated every stage of the build, ensuring that all elements, from structure to system, came together seamlessly.
It’s a project that reflects the power of partnership, where each specialist brings their best to achieve one outstanding result. designed NIBE air source heat pump system, integrating both heating and domestic hot water functionality with an electric backup.

The installation was designed to maximise efficiency, reliability, and serviceability, and the finished result went on to win recognition from Nu-Heat for excellence in design ex*****on and overall presentation.

System Design & Components

The system follows Nu-Heat’s C21 configuration, featuring:

A NIBE F2040 air source heat pump, providing primary heating and domestic hot water.
A 100-litre buffer tank and a high-performance EnergyPro HP unvented cylinder.
A combination of underfloor heating manifolds and a radiator circuit, each independently controlled via smart zoning.
Full weather-compensated controls through the NIBE SMO20 controller, optimising efficiency across varying ambient conditions.
Correctly installed flow and return temperature sensors, outdoor temperature sensors, and electrical controls, as detailed in the Nu-Heat docking schematics.

All pipework and wiring followed the manufacturer’s guidance for Part G3 discharge safety, Part L insulation standards, and MCS-020 compliance, ensuring the system can be fully certified under renewable energy standards

Installation Details

Our SCG team handled every stage of the install internally, from first fix to commissioning. Key details include:

All primary and secondary pipework installed in 28mm copper, fully insulated with Armaflex Class 0 laggingto prevent heat loss and condensation.
Flow balancing and hydraulic separation achieved through the Nu-Heat buffer and dedicated circulators for underfloor and radiator circuits.
MagnaClean HP filtration integrated for system protection and long-term efficiency.
Full electrical integration carried out to Nu-Heat’s schematic standard, including individual fused spurs, DIN-rail mounted meters, and isolators for each component.
Optional secondary domestic hot water loop capability pre-piped for future expansion.


Finishing Touches

· Beyond the technical build, the plant room was finished with Altro Whiterock hygienic wall cladding, giving a clean, clinical aesthetic while ensuring compliance with hygiene and durability standards.

· Lighting was designed to highlight the precision of the installation, with geometric LED panels enhancing visibility and presentation for maintenance and client handover.

· The result is not only a high-performance heating and hot water system but a visually striking installation that represents the SCG standard, neat, organised, and engineered for longevity.



Recognition

· We’re proud that this installation received award recognition from Nu-Heat, who designed and supplied the system, for the exceptional standard of delivery and presentation.

· This project demonstrates what’s possible when detailed design, skilled workmanship, and pride in presentation come together

If you’re a developer, builder, or homeowner looking for a main contractor who can take your project from structure to systems with complete in-house delivery, get in touch with Southern Carpentry Group today.

Just wrapped a cut & pitched roof for Hopscotch Day Nurseries 🎉Hand-cut rafters, crisp lines, ready for little learners ...
29/09/2025

Just wrapped a cut & pitched roof for Hopscotch Day Nurseries 🎉
Hand-cut rafters, crisp lines, ready for little learners under a solid shelter.

Another recently completed double story side Extention using a light weight timber frame construction over what was an e...
16/07/2025

Another recently completed double story side Extention using a light weight timber frame construction over what was an existing garage. 2 small rooms now knocked through to make 2 very sizeable spaces with a jack and Jill bathroom between. 😍

Southern Carpentry have recently completed over 150 major fire door maintenance upgrades under the BMTrada maintenance s...
15/07/2025

Southern Carpentry have recently completed over 150 major fire door maintenance upgrades under the BMTrada maintenance scheme to the Chesil lodge care home facility in Wi******er bringing this care home back to its outstanding standards.

Fire doors aren’t just doors.. they are life saving devices! đŸ™ŒđŸœđŸ™đŸŒ

Southampton university Jubilee sports centre recently underwent a changing room refit with  where we were seen to replac...
15/07/2025

Southampton university Jubilee sports centre recently underwent a changing room refit with where we were seen to replace all timber door linings to re-swing the existing doors, refitted the existing storage lockers onto a hygienic wall cladding system to prevent any further water damage. We also carried out the 3rd fix of all changing benches, signage, and vanity stations. Great work from all involved.

Another recently completed cut and pitch roof for  on his new home transformation project.
15/07/2025

Another recently completed cut and pitch roof for on his new home transformation project.

Address

Swanwick
Southampton
SO31

Opening Hours

Monday 7:30am - 5pm
Tuesday 7:30am - 5pm
Wednesday 7:30am - 5pm
Thursday 7:30am - 5pm
Friday 7:30am - 5pm
Saturday 7:30am - 12pm

Telephone

07803061077

Alerts

Be the first to know and let us send you an email when Southern Carpentry Group posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Southern Carpentry Group:

Share