14/04/2026
From the ground up.
Full electrical installation on this house - and on the ground floor, we worked with the architect client to upgrade the floor build-up.
• 50mm blinding layer of concrete over existing soil
• New joists in places and sleeper wall plates where necessary
• Telescopic vents added and air bricks for proper circulation
• Non-breathable membrane installed between joists to form a basket for wood fibre insulation
• Breathable membrane over the top
• 25mm ply finish across the whole floor
Where depth was limited, PIR insulation was used to maintain performance.
We went a bit further than just the electrical work on this one to help keep the project moving and get the client in sooner - something we’re always happy to get involved with.
A solid, well-detailed solution that you don’t see - but you feel once the space is finished.
we’ll share more of the finished result soon.