13/06/2026
Another week complete in Corby for Shore Circuit!
A productive week on site getting everything ready for the next stage of the project.
With the site cabins moving on Monday, we’ve installed and powered up a new board ready for the relocation, as well as preparing the water supply for the new cabin location.
Alongside that, we’ve continued removing redundant pipework across the site, as well as processing the armoured cables we removed during the strip out by breaking them down and separating the copper cores.
Plenty more to come on this one.
And don’t worry, we’ve still got a team working back home in Staffordshire, so if you need any electrical work carrying out, feel free to give us a shout.
📞 07702 046 373