24/04/2026
A recent job we completed after fixing another contractor’s poor workmanship.
We carried out a full flat roof replacement using a high-quality double-layer torch-on felt system, including lining all gutters. The pitched canopy was carefully realigned, with an additional row added to ensure a proper fit.
We also installed a dry ridge system and completed leadwork throughout.
The result is a fully watertight finish—completed to the standard it should have been from the start.