13/07/2025
LKP construction have been working on multiple projects and delivering these projects on time and to a great standard!
One of the sites we have been working on have been in Cornwall where the sun has been shining and fair play to the lads in the heat and still producing great productive work,
we have been carrying out
24k meters of cabling fibre+cat6
Installing Db base feeder pillars
Civils work trenching and installing road
crossings to allow us to cable from field
To field connecting the security system
Installing camera master switch boxes for the power and fibre
Hand digging trenches over high voltage power to avoid any strikes
And much moreβ¦
The guys have been staying at a Parkdean resort where after work they can chill out and enjoy the Cornwall surroundings and socialise together, itβs been great for the whole team to smash it as a team and tackle all works thrown at them
Fair play to all ππΌπ