A.G.A Group Enviro-Fix

A.G.A Group Enviro-Fix Engineering nature with environmentally sensitive contracting solutions, expert design & delivery from concept to completion.

Proudly serving projects of all sizes with a skilled, multi-disciplinary team.

Transform Outdoor Space with Sustainable Gravel Paths...Looking for a practical, attractive, and environmentally friendl...
18/06/2026

Transform Outdoor Space with Sustainable Gravel Paths...

Looking for a practical, attractive, and environmentally friendly landscaping solution? Decorative gravel paths offer the perfect balance of style and sustainability.

Gravel is naturally permeable, allowing rainwater to drain back into the ground rather than pooling on the surface. This helps reduce erosion, minimise puddles, and supports better water management, especially important during periods of heavy rainfall or drought.

Why choose gravel?

Low Maintenance – A cost-effective alternative to traditional paving, requiring minimal upkeep over its lifespan.

Versatile & Attractive – Available in a range of colours and textures, gravel can enhance parks, public walkways, green spaces, business premises, and residential developments.

Sustainable Drainage – Supports natural water infiltration, helping organisations meet environmental and drainage objectives.

Durable & Practical – Suitable for high-footfall areas while maintaining a natural appearance that blends seamlessly into the surrounding landscape.

We work with councils, commercial organisations, developers, and landowners to deliver high-quality gravel path and driveway solutions that combine functionality, sustainability, and visual appeal.

Contact our team to discuss your next project, enviro-fix.co.uk

Case Study: Pond Lining Project, Windlesham, SurreyWorking on behalf of Frost Landscapes for Gordon Murray Automotive, w...
12/06/2026

Case Study: Pond Lining Project, Windlesham, Surrey

Working on behalf of Frost Landscapes for Gordon Murray Automotive, we successfully delivered the specialist lining of a newly excavated pond using 1,800m² of EPDM liner.

One of the key challenges was the discovery of significant groundwater during excavation. Our team designed and installed a bespoke drainage solution beneath the liner, ensuring long-term pond stability and protecting the integrity of the installation.

✅ 4-week programme
✅ Specialist EPDM liner installation
✅ Custom groundwater management system
✅ Lake Aid aeration system installed

Read the full case study on our website;

enviro-fix.co.uk/lining-of-newly-excavated-pond/

When it comes to embankment reconstruction, stability is everything, especially on steep or vulnerable banks, margins, a...
28/05/2026

When it comes to embankment reconstruction, stability is everything, especially on steep or vulnerable banks, margins, and shorelines.

A solution, erosion control blankets, they are a key part of delivering long-term, sustainable solutions.

Made from 100% natural coir, these blankets provide immediate surface stability while protecting exposed soil from erosion. Their strong silt collection properties help retain sediment and create the ideal conditions for vegetation to establish.

Over time, the blanket naturally decomposes (typically within 3–5 years), leaving behind a fully stabilised, vegetated embankment, without the need for synthetic materials.

From supply to installation, we ensures each solution is tailored to the site, helping restore and protect landscapes in a way that works with nature, not against it.

envito-fix.co.uk

Last week was  , we were reminded that strong environments start with strong people.Mental health matters in every envir...
21/05/2026

Last week was , we were reminded that strong environments start with strong people.

Mental health matters in every environment:
🌿 On-site
🌿 In the office
🌿 At home

Taking time to check in, support one another, and create a positive working culture is just as vital as any project we deliver.

Let’s build healthier environments, for nature and for each other.

14/05/2026

🚨 PLAYER SPONSOR ALERT 🚨

We’re delighted to announce another Player Sponsor confirmed for the 2026/27 season 🔴⚫️

A huge thank you to Enviro-Fix – Engineering Nature for sponsoring Blake Collings 🙌

Operating throughout the East of England, Enviro-Fix specialise in:
🌱 Landscaping
🚜 Groundworks
🏗️ Civil Engineering
🌍 Environmentally Sensitive Solutions

Led by Jake Girdler, Enviro-Fix are committed to delivering fresh, forward-thinking approaches tailored to every client’s needs.

Enviro-Fix are also proud to be part of the A.G.A. Group (A.G.A. Group Enviro-Fix Limited), providing access to extensive expertise in:
✅ Ecological Surveying
✅ Land Management
✅ Water Quality Analysis
✅ Environmental Consultancy & Contracting

Thank you to Jake and the entire team for your fantastic support of Wymondham Rugby Club and Blake Collings ❤️🖤

Interested in sponsoring a player next season?
📩 Get in touch today:
[email protected]

08/05/2026

We're pleased to share progress on our hard landscaping works at Norwich Castle Gardens.

Enviro-fix was awarded this project following a competitive tender process with Norwich City Council, and it's great to see the transformation now taking shape on site.

This £400,000 revamp is part of a wider programme to restore and enhance this important public space introducing new improved seating areas, and wider, more accessible pathways to better connect the gardens with the surrounding city.

The project will help create a more welcoming, accessible and enjoyable environment for visitors, while complementing the historic setting of Norwich Castle.

Check out some photos from site showing the works currently in progress, with more updates to follow as we move towards completion.

For more on the project, see the coverage from the beginning of the year by the Norwich Evening News:

https://lnkd.in/ec2GF5VB

While Enviro-Fix is proudly rooted in Norfolk, our work doesn’t stop at the county line.No matter the location in the UK...
30/04/2026

While Enviro-Fix is proudly rooted in Norfolk, our work doesn’t stop at the county line.

No matter the location in the UK, our mission stays the same, working with nature to create sustainable, long-lasting solutions that protect and enhance our environment.

Wherever your project is based, we’re ready to support. Get in touch today.

enviro-fix.co.uk

World Earth Day 2026 is an opportunity to highlight what drives us, creating real impact through nature first solutions....
22/04/2026

World Earth Day 2026 is an opportunity to highlight what drives us, creating real impact through nature first solutions.

From restoring wetlands and strengthening riverbanks to creating habitats that support thriving ecosystems, our work is all about protecting and enhancing the natural world around us.

This Earth Day, we’re proud to continue delivering sustainable, eco-friendly solutions that improve biodiversity, protect waterways, and help build a more resilient planet for future generations.

Together, small actions lead to lasting change.

Reduce Velocity and Protect ShorelinesOur Rock Rolls are a cost-effective solution to reducing river velocity while esta...
16/04/2026

Reduce Velocity and Protect Shorelines

Our Rock Rolls are a cost-effective solution to reducing river velocity while establishing banks, edges and shorelines. Used in conjunction with our Coir Rolls, Rock Rolls provide an incredibly robust sub-structure through which aquatic plants can establish. The solid foundation makes for enhanced erosion resistance, bank support and habitat enhancement.

What sets our Rock Rolls apart?

They’re manufactured using locally sourced Norfolk flint, combining regional materials with engineered strength to deliver a sustainable, high performance solution you can trust.

To get a quote visit us at enviro-fix.co.uk/rock-rolls

10/04/2026

Case Study: Headwall Design & Installation – Mallards Way Pond

Last year we completed the design and installation of a new headwall system at Mallards Way Pond Maidstone Borough Council, delivered in just one week.

The project involved removing an aging weir, stop log system, and culverted pipe, followed by the installation of a precast concrete Althon H6C A headwall with integrated debris management and a modular stop log system for flexible water level control.

The upgraded infrastructure has improved flow regulation, reduced maintenance requirements, and enhanced the pond’s overall environmental stability, while allowing for easy seasonal adjustment of water levels.

This scheme formed part of a wider programme of works across three sites in the Maidstone area.

Read the full case study here: enviro-fix.co.uk

Address

Merton Hall Ponds
Thetford
IP256QH

Opening Hours

Monday 8am - 5pm
Tuesday 8am - 5pm
Wednesday 8am - 5pm
Thursday 8am - 5pm
Friday 8am - 5pm

Alerts

Be the first to know and let us send you an email when A.G.A Group Enviro-Fix posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to A.G.A Group Enviro-Fix:

Share

Category