12/04/2026
Client asked me for some advice to upgrade their consumer unit.
They had a peak (24 hour fuse box) consumer unit and a redundant off peak one (old storage heaters)
I proposed to change the peak board and to power up the old storage heater points and change over the spur outlets to single sockets giving them additional power points.
If you want a quote drop me an email
[email protected]