12/11/2025
Started this Job while back just over weekends aswell as sub contracting. Cutting out and replacing timber joists, also taking small partition down and a timber beam replacing a new c24 beam on two concrete pads supported with two treated 4x4 posts to open up the room. Framed up the walls with 50mm Kingspan and plasterboard and taped. Ready for new kitchen