Power Flushing an old gravity central heating system today. All ready for the new Combination Boiler 🔥😍
02/03/2021

Power Flushing an old gravity central heating system today. All ready for the new Combination Boiler 🔥😍

Upgraded this old boiler and central heating system this week.The system was converted from gravity to pressurised. An i...
19/02/2021

Upgraded this old boiler and central heating system this week.

The system was converted from gravity to pressurised.

An ideal logic max with 10years warranty was the choice of boiler.

A 180L Everflo was the choice of Cylinder.

Both have been relocated and installed in the loft.
This was to give streamline installation and operation.

I had a big challenge for the Kamco cf90 Powerflush today! I was called to powerflush a clients F&E gravity C/H system, ...
01/01/2021

I had a big challenge for the Kamco cf90 Powerflush today!

I was called to powerflush a clients F&E gravity C/H system, and the best machine for the job, was the kamco CF90.

The clients were reporting less and less heat output from their radiators around the house. Their old heat only boiler was seriously struggling with the system. As a result of multiple blockages in the radiator system the boiler was over heating, and shutting down.

If any Central Heating system is not protected with a chemical inhibitor, you can get corrosion inside the pipework and radiators. The corrosion causes debris and sludge build up. This sludge is magnetic so can be filtered out using the large Kamco magnetic filter picture. A chemical cleaning agent is used whilst power flushing to speed up the cleaning process.

The system was so dirty the circulation pump had become so blocked and worn. So a new grundfos circulation pump was installed.

Due the the age of the system, the Central heating motorised valve and the hot water motorised valve were also showing signs of corrosion build up. These were also changed to Honeywell 2 port zone valves

Once the system was nice and clean, chemical inhibitor was administered

CF 90 Kamco powerflush carried out before replacing the combi boiler. The Previous combi boiler had a number of leaks ov...
01/01/2021

CF 90 Kamco powerflush carried out before replacing the combi boiler. The Previous combi boiler had a number of leaks over the years causing serious corrosion. This and other contributing factors outlined a new boiler was needed. New Baxi Platinum 40 Combi was the best suited boiler for this property - 10 year warranty. Finished off with a smart nest E thermostat