STONE UK Grab hire, Groundworks and Aggregate supplies

STONE UK Grab hire, Groundworks and Aggregate supplies We are a waste management company Located within northwest London providing Skip hire, Grab hire,

Established in waste management for over 20 years we have been involved in recycling of wood waste for biomass, remediation of land , recycling of stone and aggregate , producers and distributers of top soil , mulch, woodchip and special blends, we have supplied soil, crushed concrete, sand and ballast to railway stabilization projects over west London, westminster abbey landscape project, The mou

nt prison Bovingdon, hyde park concerts, London zoo and Whipsnade, carried out waste recycling and supplied logistics for farnborough air show 2018,
provide muck away and grab hire across London and surrounding areas, rent out recycling equipment ,excavators and earthmoving equipment, provide skip hire from 4 yard skips to 12 yard skips ,. 20 yard bins to 40 yard bins , tipper hire for muck away, we are groundwork , building and demolition contractors, drainage , ditching. land fill, construction and landscape ,land projects like golf courses, land clearance land leveling and bunds.

Oversite preparation and services exposed  ready for footing dig out
20/05/2023

Oversite preparation and services exposed ready for footing dig out

New job start , Garage demolition concrete base removal and ground preparation ready for foundation works , part of a la...
20/05/2023

New job start , Garage demolition concrete base removal and ground preparation ready for foundation works , part of a large side extension and also a rear conservatory demolition and extension

Pond backfilled and ground leveled
09/01/2023

Pond backfilled and ground leveled

23/11/2022

Muck Grab in west london negotiating the bt lines

Final days of the tree job , last lorry load of timber and finally securing the rear garden with a new fence, another jo...
15/10/2022

Final days of the tree job , last lorry load of timber and finally securing the rear garden with a new fence, another job done.

Large tree felling job carried out over 2 weeks , the trees were condemned by harrow council and and enforcement to have...
15/10/2022

Large tree felling job carried out over 2 weeks , the trees were condemned by harrow council and and enforcement to have them felled was issued , given the dangerous condition of the trees we dismantled them via a cherry picker which we were able to get into the rear gardens via the park access

Nw10 job taking the final load from a basement dig across a wall and below ground level
28/06/2022

Nw10 job taking the final load from a basement dig across a wall and below ground level

This is a gabion wall and landscape project at the starting stage and on completion,  the rear garden started 4ft from t...
26/06/2022

This is a gabion wall and landscape project at the starting stage and on completion, the rear garden started 4ft from the rear of the building and at its previous height was was level with the top window of the house, approximately 280 tons of chalk was removed before levels were drawn and instalation could begin, the baskets were all made in situ with a 10mm tolerance over site , each 2mtr run took approximately 3ton of stone and backfill and all facings were laid by hand, there were 6 levels from the ground with a curved flight of steps to adjoin 3 seating areas , we installed all drainage for the house wich had to come from the rear and along the south elevation toward the road, We then competed the front levels a installed retaining gabion at the front of the building with upright sleepers for planters and finally the new lawn was installed , We worked alongside other trades as the building was being fully refurbished at the time the job took around 11 moths to full complete and approximately 1400 tons of materials were moved by mini excavator, dumper and by hand , the last part of the program was to lift the excavator from the rear garden over the roof of the building once all top levels were completed.

Foundation works re ruslip , backfill removed , foundation excavated and clay removed, concrete poured ready for block w...
24/06/2022

Foundation works re ruslip , backfill removed , foundation excavated and clay removed, concrete poured ready for block work, claymaster was installed on the south elevation due to a none existing tree removed 10 years ago🤨

Demolition of a double garage in ruislip , they was soft stripped of all internal clading and sound proofing before we c...
13/06/2022

Demolition of a double garage in ruislip , they was soft stripped of all internal clading and sound proofing before we could start the demo works ensuring no waste contaminated the concrete and hardcore , we then grabbed the materials away and took them for recycling to go back into construction materials, once cleared we then proceeded with the foundation dig.

Address

-
Uxbridge
UB96LX

Opening Hours

Monday 7am - 8pm
Saturday 7am - 8pm
Sunday 8am - 12pm

Telephone

+442086225151

Alerts

Be the first to know and let us send you an email when STONE UK Grab hire, Groundworks and Aggregate supplies posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share