09/08/2026
π Last-minute job completed in Hemsworth!
Called in at short notice after the customer was let down by another contractor β with only a few days left before use of the field agreement ended we decided to work the weekend to get this done
From a bombsite to a fully topsoiled garden in just a day and a half
βοΈ 30 tonnes of oversized rubble picked out and sifted through
βοΈ Ponds filled in
βοΈ A full wagon load of sleepers & tree stumps pulled out
βοΈ Ground levelled and prepared
βοΈ 70 tonnes of double-screened topsoil brought in, spread and levelled
JCB doing 3X the work of a mini digger, while eliminating the need for dumpers.
More done in a day. ππ¨