14/07/2026
The team are now on site in Leicester, working on a mammoth 15 storey tower block delivering communal ventilation to every floor.
Rigid galvanised steel ducting throughout, running from the risers out to each apartment — a robust, long-life setup that's well suited to a building of this height and occupancy. Communal systems like this need to be right first time, so it's careful, methodical work floor by floor, coordinating closely with the other trades as the build progresses.
It's a change of pace from the housing developments we've been posting about recently, and a good example of the range of work our install teams take on — from single plots on new build sites through to high rise communal schemes.
CVC is actively looking for people to join our install team, with full training provided. If you'd like to build a career in renewables, we'd love to hear from you — get in touch at [email protected].