24/07/2026
Our current extension build-A challenging site ment the groundwork’s were extremely difficult and time consuming but now that’s out the way, we’re flying!
This timberframe extension is being fully built and erected on site by our team. Adding 100 square m of ground floor area and 70 square m at first floor.
DK Groundworks & Construction Stuart Rich Graham Mankin Dynamite Scaffolding
Robert Potter Will Hicks Josh Beazley Jordan Beazley and Joey