31/08/2026
Another health and safety audit on site last week at our Dental project in Southampton……
Ongoing site inspections are a key part of what we do beyond the drawings, walking the job, checking the compound arrangements, signage, welfare, the signing-in register, and how the works are actually being carried out on the ground. A few minor hazards picked up this time, but nothing of any significance; the contractor is running a tidy, well-organised site and doing a fab job.
Great progress since our last visit:
-Stud partitions up and plasterboard/skim complete to the treatment rooms
-Mechanical ventilation and ductwork installed through the first floor
-Air conditioning condensers mounted to the rear elevation
-Accessible WC fully tiled out and fitted with grab rails and safety flooring
-Safety flooring down to the first-floor treatment rooms
-External works underway to the frontage
And always good to catch up with the client on site and grab a photo together 📸
--------------------------
Off the back of projects like this, we've produced our
- Principal Designer CDM Guide &
- Principal Contractor CDM Guide (included extension + loft conversion domestic work)
A clear, practical breakdown of the CDM duties, who holds what responsibility, and what should be in place before and during the works. We're happy to share it with anyone who'd find it useful, and equally happy to help clients and contractors put it into practice on their own projects.
If you'd like a copy, comment below or send me a message with a PDG or PCG, and I'll get it over to you.
******er