25/02/2024
A refurb job done last year involving: A combination boiler conversion into the loft. Existing boiler was located in the kitchen. Kitchen replacement including first and second fit electrics and plastering. Removal of existing airing cupboard and walls to make way for a larger replacement bathroom. And larger loft hatch/access ladder to make for safer access to loft.