23/09/2024
Converting a 2nd story bedroom to a bathroom. Room was stripped, floors taken up and plumbing laid and re plastered. Floor boards secured and over-boarded. Floor built up where un level then screeded with self levelling cement. Tile matting laid then tiled. Feature tile with border central to room. Room painted then bath, toilet and vanity unit fitted with templates mirrors above.