23/10/2026
Another plot completed at Silverlake âś…
Floor build-up installed and ready for the next stage:
• Damp proof membrane
• 150mm PIR insulation
• 50mm PIR upstands to the external walls
• Perimeter expansion foam to the internal walls
• Slip membrane
• Underfloor heating pipes
• Cemfloor C20 cement-based liquid screed
A tidy finish and a solid foundation for the next stage of the build.
DorsetConstruction SWLiquidScreed