16/04/2023
Sorting out a 3phase supply on a domestic property this week. Preparing for 2 Tesla power walls and 2 Zappis. The original install by a sub contractor had overlooked some details. Fitted a switched fuse next to the main cutout as the 3 and main board is 15 metres away
******er ******erelectrician