Advanced Power Services Ltd

Advanced Power Services Ltd HV and DC Cable Jointing, Cable Terminations, Oil and Gas Cable Decommissioning, Fault Location and Cable Repairs.

Established in July 2010, Advanced Power Services team of experts cover a comprehensive electrical service covering Consultations, HV and DC Cable Jointing, Cable Terminations, Oil and Gas Cable Decommissioning, Fault Location and Cable Repairs. We are proud to be Link Up Approved via Achilles Audit and our continued success has expanded across the industry working on Network Rail, London Underground, Solar Farms and Off Shore Wind Farms.

06/11/2024

Today is National Stress Awareness Day, have a good day everyone.

Hi All,We are raising money for cancer research this weekend if you would like to sponsor us please do we will be very g...
10/06/2024

Hi All,

We are raising money for cancer research this weekend if you would like to sponsor us please do we will be very grateful ☺️

Cancer is happening right now, which is why I'm taking part in a Race for Life to raise money and save lives. 1 in 2 people will be diagnosed with cancer in their lifetime. Every single pound you donate makes a difference to Cancer Research UK’s groundbreaking work.

Hi All, I hope everyone is well. As a business and a team you all know we try our best to help others and charity's when...
03/06/2024

Hi All, I hope everyone is well.

As a business and a team you all know we try our best to help others and charity's when and where we can.

So on 16th June 2024, some of the Advanced Power Services team with some of their family's are taking part in the Race for Life.
Please help us hit our target to raise £800 to help Cancer Research by donating whatever you can,
no amount is too small.

Cancer is happening right now, which is why I'm taking part in a Race for Life to raise money and save lives. 1 in 2 people will be diagnosed with cancer in their lifetime. Every single pound you donate makes a difference to Cancer Research UK’s groundbreaking work.

A busy bank holiday for some of us this weekend working staggered shifts installing an end box modification. We designed...
06/05/2024

A busy bank holiday for some of us this weekend working staggered shifts installing an end box modification. We designed and fabricated this unit awhile back now and this BH was the event to get the old one off and out and this new one in and on. All works now complete along with making the termination to a stepdown transformer, testing the new box and completing the withstand testing on the cable.

Well done to the teams and the office staff that were involved in this particular
project 👏👏

We are proud to be sponsoring West Park C.E. Primary School’s Christmas Fayre today!So if you are in or around the Worth...
01/12/2023

We are proud to be sponsoring West Park C.E. Primary School’s Christmas Fayre today!
So if you are in or around the Worthing area pop along from 4pm and make a start on your Christmas shopping 👍

Fluid stop joint being made, tomorrow will be installing the separable connectors and boxing up and filling. Well done c...
27/11/2023

Fluid stop joint being made, tomorrow will be installing the separable connectors and boxing up and filling. Well done crew

33kV transformer end box modified to accept XLPE cables. The new end-box was desgined, machined and fabricated, painted ...
27/11/2023

33kV transformer end box modified to accept XLPE cables. The new end-box was desgined, machined and fabricated, painted installed and commissioned back into service.

Cable spiking and joint cut outs and phasing for new supply connections to a private site over in Manchester.
10/10/2023

Cable spiking and joint cut outs and phasing for new supply connections to a private site over in Manchester.

This is a high speed train in for regular maintenance over a pit in Scotland. We slipped in to make up a new power cable...
09/10/2023

This is a high speed train in for regular maintenance over a pit in Scotland. We slipped in to make up a new power cable that takes 25kV from the over heads off the boom to power an onboard transformer. Cable made and tested and train entered back into service.

Little 11kV power install going on locally with LV mains connections, this project scope includes testing and commission...
09/10/2023

Little 11kV power install going on locally with LV mains connections, this project scope includes testing and commissioning two step down transformers all cabling and board change overs, plus DNO connections and metering and substation supplies and cable containment there’s still a bit to do but the lads are doing well.

Address

Worthing
BN114HE

Alerts

Be the first to know and let us send you an email when Advanced Power Services Ltd posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Advanced Power Services Ltd:

Share

Category