10/06/2026
OCH Huddersfield Site subcontracting for Grk Civils Limited on a Bam Construction UK site in full flow. Taking on all Civils & Externals works. A little update of what the boys have been doing. Any companies looking for reliable and experienced subcontractors with a wealth of experience feel free to get in touch.
Civils -
- very tricky dig navigating around services which the boys have done fantastic with.
- drainage installed underground
- accos installed
- ducts installed into feeder pillars
- stoned up to correct heights ready for concrete
-concrete base put down ready for paving.
Externals
- bike store being paved and extending to kerb side 359sqm 8ml joints
- cobble sett path 400sqm sizing from 100mm-200mm 8ml joints
- pathways paved
-benches installed.