Gemstone Bathrooms And Renovations

Gemstone Bathrooms And Renovations New bathroom suites to full property Renovations. Experienced Lead Roofer.
26 years experience. All Leadwork undertaken.

For all your plumbing needs;
Full bathroom suites to a simple tap washer replacement. General roof repairs.
20 years experience.

Nice little Mosaic tiled porch here.The old paving slab step was removed and replaced with concrete to form a solid base...
20/12/2025

Nice little Mosaic tiled porch here.
The old paving slab step was removed and replaced with concrete to form a solid base for the tiles.

One more bedroom to bathroom and bathroom to bedroom change over job to complete next week and its Christmas.

Hope you all have a great one, and all the best for the new year! 🎄 🎅 🧑‍🎄

A lovely bathroom to wet room conversion here. There was a lot of work in this one, but the end result was worth it.
23/10/2025

A lovely bathroom to wet room conversion here.
There was a lot of work in this one, but the end result was worth it.

Really enjoyed this job. It was to change the direction of the staircase, back to the way it was originally. Fully plast...
18/07/2025

Really enjoyed this job. It was to change the direction of the staircase, back to the way it was originally. Fully plastered and fully decorated. New Reclaimed doors throughout and a new staircase.
Shout out to Shaun Mortimer for the help stripping it back and Platinum Plastering and Renovations for sorting the extra large wall out before the stairs were installed.

We are slowly drifting towards doing more of the construction work now folks. Please feel free to get in touch for free no obligation quotations.

Here's the latest bathroom installation.Full strip out,Ceiling completely removed due to a previous leak,New ceiling ins...
10/02/2025

Here's the latest bathroom installation.
Full strip out,
Ceiling completely removed due to a previous leak,
New ceiling installed,
All timber work stripped and painted,
New suite installed,
Tiling round the bath,
Tounge and grove cladding half hieght and bath panel, with hand cut capping,
Fully decorated,
Yacht varnish on the floor (a 1st for me but love this look),
Our customer was keen to keep the mirror and shelves as his father made this, we stripped and painted this to match the rest of the room.

We also installed a new hot water cylinder, new header tanks and radiators all round the property.

The finished loft conversion here. It was a hip to gable conversion with a full width dormer at the back. It's been comp...
13/10/2024

The finished loft conversion here. It was a hip to gable conversion with a full width dormer at the back.
It's been complete for a couple of months now, but only just got round to posting it. Really enjoyed doing this one, something a little bit different.
We are taking on more of these jobs now, including extensions. The team I've been working on for a while now has finally come together.

The latest little ensuite
09/10/2024

The latest little ensuite

That's the main rooms all plastered out just the stairs to do next week. Very close to completion now. Just awaiting som...
28/07/2024

That's the main rooms all plastered out just the stairs to do next week. Very close to completion now. Just awaiting some tile and suite choices for the ensuite and some colours for the walls.

The windows finally turned up for this loft conversion. Hardie planks have been used to clad this dorma, these are made ...
19/07/2024

The windows finally turned up for this loft conversion. Hardie planks have been used to clad this dorma, these are made from a cement board and carry an A2 fire rating.
The scaffold will be down next while it's
Back to the plaster boarding for us.

GRP certificate has come through today.
25/06/2024

GRP certificate has come through today.

This loft conversion well on the way now. We've converted the roof from hips to a gable end, with full length rear dorma...
20/06/2024

This loft conversion well on the way now.
We've converted the roof from hips to a gable end, with full length rear dorma.
We'll get the roof on next week and then start on the insulation and plastering .

Reposting this one as it seems to have disappeared from the page. Lead bay top, reconfigured to prevent rain water exiti...
17/06/2024

Reposting this one as it seems to have disappeared from the page.
Lead bay top, reconfigured to prevent rain water exiting down the front. We formed a gutter at the rear and made a lead down pipe to connect directly into the existing rainwater pipe.

Address

York
YO264UG

Telephone

+447877877882

Website

Alerts

Be the first to know and let us send you an email when Gemstone Bathrooms And Renovations posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Gemstone Bathrooms And Renovations:

Share