06/06/2026
Rising higher: Level 3 structural ex*****on.3️⃣🏗️✨
We are pushing the boundaries further as we officially enter the structural phase of Level 3. The team is currently synchronized across three major milestones: meticulously assembling the formwork (bekesting) for the third floor, constructing the main concrete staircase leading up, and reinforcing the entire floor with precise steel plate rebar installation. At Kreasindo, every layout is heavily cross-checked to lock in maximum structural integrity.
CTA: Contact us: 0812 1075 2459
Your dream house starts with Kreasindo.
# CHouse