01/09/2026
Remember this one? Now have a look at the site assembly photos!
The project involved a 5-section modular building with 3.8m ceilings, designed to be used as an assembly area.
The increased ceiling height meant the building was too tall to transport using our usual 3D volumetric modular system. Rather than compromise on the client's requirements, we developed a different solution.
The building was:
- Constructed in our factory
- Disassembled for transport
- Delivered to site as a "flat pack"
- Reassembled on site
This was the first time we'd taken this approach, and we're delighted with how successfully the project came together.
It’s a great example of how modular construction can be adapted to meet challenging specifications — while still keeping on-site construction time to a minimum.
Different challenge. Different approach. Same goal: delivering the right solution for our client.