NTS Marine Structural Components and Piping Systems

whirlpool bath demolition completed in preparation for upcoming dry dock works 🔧⚓️Our team carried out the safe removal ...
02/06/2026

whirlpool bath demolition completed in preparation for upcoming dry dock works 🔧⚓️

Our team carried out the safe removal of an existing whirlpool bath unit to prepare the area for the next phase of installation onboard.

Works included disconnection of all associated pipework and services, controlled dismantling of the structure, and careful removal to protect surrounding areas.

The space has now been fully cleared and prepared, ready for upcoming upgrades as part of the dry dock schedule.

Another important step completed by the team. Watch this space for the next stage 👀

Last week, NTS marked Mental Health Awareness Week by encouraging our team to ‘Have a Break’ and take time to focus on t...
19/05/2026

Last week, NTS marked Mental Health Awareness Week by encouraging our team to ‘Have a Break’ and take time to focus on their wellbeing.

We shared some sweet treats with the team to create an opportunity to pause, connect and check in with one another, supporting this year’s theme of Action.

Stair Prefabrication In-HousePrefabricated stairs delivered and installed for a cruise vessel project ⚓️This project was...
04/05/2026

Stair Prefabrication In-House

Prefabricated stairs delivered and installed for a cruise vessel project ⚓️

This project was fabricated in-house and carried through to final installation, ensuring precision at every stage.

The stair system was designed to integrate seamlessly within the vessel layout, with careful attention to structural integrity, alignment, and onboard safety requirements.

Controlled fabrication, combined with efficient installation, allowed for a smooth process and a high-quality finish.

Another example of delivering practical, reliable solutions for marine environments.

Steel deck closure successfully completed 🔧⚓️Our team carried out the full scope of steel works required to close and se...
28/04/2026

Steel deck closure successfully completed 🔧⚓️

Our team carried out the full scope of steel works required to close and separate a two deck venue.

From structural preparation to precise fitting and welding of steel plates, every stage was completed with accuracy and attention to detail.

The result is a strong, durable finish designed to perform reliably and provide additional valuable accommodation space for our client.

Quality work delivered by the team 👏

Our technical team is currently out on dry dock, delivering critical upgrades and improvements across the cruise vessel....
20/04/2026

Our technical team is currently out on dry dock, delivering critical upgrades and improvements across the cruise vessel. ⚓️

From Grey Water systems and Potable Water installations to enhancements in the main casino and non-smoking areas, every detail is being carefully executed. Our team is also working on CO2 systems in the kids club and important pantry upgrades to ensure everything runs safely and efficiently.

It’s a demanding environment, but their expertise, dedication, and teamwork keep everything moving forward. Great work by everyone involved 👏

Another precision whirlpool bath project completed by the NTS team 🔧💧Our role in this installation focused on the plumbi...
01/04/2026

Another precision whirlpool bath project completed by the NTS team 🔧💧
Our role in this installation focused on the plumbing and technical elements that ensure the system performs reliably and efficiently from day one.

Works included preparation of a reinforced, level base for structural support, along with precise positioning to accommodate the unit. We completed all plumbing connections, integrating pipework with the pump and filtration system to ensure optimal flow and performance.

Full pipework pressure testing and commissioning were also carried out, alongside key thermal efficiency considerations to support heat retention and overall system reliability.

By focusing on the technical groundwork, we help ensure every system is built on a solid, dependable foundation.

bathInstallation

Pump room installation completed by the NTS team 🔧💧 This project involved the full setup and organisation of a dedicated...
20/03/2026

Pump room installation completed by the NTS team 🔧💧

This project involved the full setup and organisation of a dedicated pump room, designed to deliver efficient system performance and long-term reliability. From neatly routed pipework to the correct positioning of pumps and filtration equipment, every element was installed with functionality and accessibility in mind.

We prioritised a clean, well-structured layout to support ease of maintenance, while optimising flow and overall system efficiency. Full pressure testing and commissioning were carried out to ensure everything operates exactly as intended from day one.

🚢 NTS Latest Project Cruise Vessel High Pressure Washing SystemNTS Technical Services has completed the installation of ...
06/03/2026

🚢 NTS Latest Project Cruise Vessel High Pressure Washing System

NTS Technical Services has completed the installation of a specialised high pressure washing system onboard a cruise vessel.

Designed for harsh maritime conditions, the system combats saltwater corrosion, biofouling such as algae and barnacles, and heavy grime both on deck and during dry dock operations.

Project Scope:

✔ Installation of industrial grade high pressure pump system
✔ Marine rated stainless steel pipework and fittings
✔ Integration with onboard water supply
✔ System testing and commissioning

The system is designed for hydro blasting hull cleaning as well as routine deck maintenance, ensuring efficiency, environmental compliance, and protection of the vessel’s structural integrity.

Delivering reliable marine solutions built to perform at sea.

🔧 NTS Technical at Work – Heating System Valves Installation NTS Technical has successfully completed the installation a...
20/02/2026

🔧 NTS Technical at Work – Heating System Valves Installation

NTS Technical has successfully completed the installation and servicing of heating system valves onboard, a critical system responsible for maintaining stable and comfortable temperatures across ship cabins and other key operational areas.

These valves play a vital role in regulating heat distribution, ensuring:

✔️ Consistent temperature control
✔️ Crew comfort and safety
✔️ Efficient system performance
✔️ Reliable operation in demanding marine environments

Our team continues to deliver precise, reliable technical solutions that support smooth vessel operations and long-term system efficiency.

⚙️ Quality work. Technical expertise. Marine reliability.

⚓ Dry Dock Works UpdateDuring the current dry dock period, NTS is carrying out a comprehensive piping installation scope...
12/02/2026

⚓ Dry Dock Works Update

During the current dry dock period, NTS is carrying out a comprehensive piping installation scope, including:
🔧 Grey water system
🔧 Black water system
🔧 Vent lines
🔧 Sea water piping

All installations are executed in accordance with class requirements and project specifications, ensuring reliability, safety, and long-term operational performance.

Another step forward in delivering high-quality marine engineering solutions.

Address

Unit 4-6 Railway Exchange, North Road
Monaghan
H18YK54

Opening Hours

Monday 8:30am - 5:30pm
Tuesday 8:30am - 5:30pm
Wednesday 8:30am - 5:30pm
Thursday 8:30am - 5:30pm
Friday 8:30am - 5:30pm

Telephone

+442830258450

Alerts

Be the first to know and let us send you an email when NTS posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share