DGD Shredding already had sustainability built into the way it operates. Solar was the next practical step.
MarVal Power installed a 54 kWp rooftop system using 130 Longi panels and an SMA Core 2 inverter, with no disruption to day-to-day operations. The project helped DGD Shredding cover around 30% of its energy requirements, with projected lifetime savings of more than 285,000 euro and 299 tonnes of carbon avoided.
That is what a working roof can do when the system is designed around the business.
See what yours could cover at marvalpower.ie.