Messon Electricals

Messon Electricals Contact information, map and directions, contact form, opening hours, services, ratings, photos, videos and announcements from Messon Electricals, Electrician, 200G, DDA Flats, Rajouri Garden, Delhi.

05/11/2024
755kV, Grid Sub-Station, Installation of 1500MVA Transformers
14/04/2014

755kV, Grid Sub-Station, Installation of 1500MVA Transformers

Process Data to the Cloud
30/01/2013

Process Data to the Cloud

Thermal Imaging of Power Infrastructure to anticipate failures before the happen.
01/12/2012

Thermal Imaging of Power Infrastructure to anticipate failures before the happen.

i-cubed's GAME geospatial media server playing IR video of transmission power lines captured from a helicopter-mounted Cloud Cap Technology gimbal camera.

If one could combine flying machine with thermal imaging.
22/07/2012

If one could combine flying machine with thermal imaging.

Phoenix Arizona's leading aerial photography and videography service

Thermal Imaging for transformer temperature excursions. The image below is capturing high temperature on the transformer...
21/07/2012

Thermal Imaging for transformer temperature excursions. The image below is capturing high temperature on the transformer bushing.

Thermal Imaging Blog by Fluke Thermography provides in-depth explanation & information on the use of thermal imagers & infrared cameras.

Thermal imaging for transmission line inspection. This solution is also available for transformer monitoring.
21/07/2012

Thermal imaging for transmission line inspection. This solution is also available for transformer monitoring.

An introduction to Thermal Image power line inspections using our Polytech Kelvin 350 mk1 camera system. For further details on our range of electricity serv...

21/07/2012

Visit us at Booth 18 during Trafotech 2012.

Kanpur Fertilizer Corporation Ltd (KFCL) was recently purchased by Jaypee. This was previously Duncans operation. Messon...
05/06/2012

Kanpur Fertilizer Corporation Ltd (KFCL) was recently purchased by Jaypee. This was previously Duncans operation. Messon has responsibility to bring 84 transformers on-line. The factory has been non-operational for 5 years. These pictures are of 3 x 50MVA that are being fed from 132KV line.

28/05/2012

45C on Saturday / 50MVA Transformer, 133KV to 11KV, @ KFCL, Kanpur charged from Kesco.

NDPL Pritampura 66KV Grid Substation @ night.
15/05/2012

NDPL Pritampura 66KV Grid Substation @ night.

13/05/2012

Removed the transformer core, cleaned it, took insulation paper samples for DP test and then put the core back into the transformer within a day.

Address

200G, DDA Flats, Rajouri Garden
Delhi
110027

Alerts

Be the first to know and let us send you an email when Messon Electricals posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share

Category