03/03/2025
Basement 2' ft Height
Collums structure (9"X9"), Concreate bed - 4" Thickness
Structure works
MS Apollo Pipes Based on the Drawing Plan.
Westron Cumods wall mount with plus tank
One Hand Shaver set for Bath
Plumbing Works Bath Room Fittings, up to overhead tank connection
Labour Charges
Floor Tiles Cost around 45 Rs (18'X16.5')
Wall Tiles Cost around per box 320 Rs (8'X5')
Bath Room Tiles Cost around 45 Rs (8'X5')
Flooring Works
Parking Tiles Cost around 35 Rs (18'X8')
Labour Charges
Windows
All CPVC 2 Nos
Main Door
Bed Room 1 Nos
Doors CPVC
Bath Room 1 Nos
Electrical Works
Walls & Roof
Transport
All Room with PVC (Sudhakar) Conceals pipes with Finolex/ Poly Cab wiring and All anichor brand items like swiches, mcbs.
Labour Charges
Walls Size - Side
Walls Size - Front & Back
Celling Top Celling Front