25/02/2014
Design
The principal circulation decisions were as follows a single entry point into the Mega store with access to the Experience from inside the Mega store.Circulation at Mega store level that takes you around the store and brings you back to the POS for payment prior to exiting.Experience ticket sales within the store and connected to the POS area for simplicity. Controlled vertical circulation up to the Experience from the store once the visitor has bought a ticket. Circulation at Experience level that allows a logical return to the rear of the Mega store level once the Experience has been completed so that the visitor can make retail purchases and exit. One ‘down only’ escalator is to be installed as a way of avoiding short circuiting of vertical circulation.