24/06/2026
Earlier there was no stair curve in our schematic plan, but after the plinth grade slab casting, the client suddenly demanded an increased floor-to-floor height for the ground floor. By that time, the lift walls had already been cast, so we increased the slab height and added six more risers. The biggest challenge was the limited space available for the lowest landing. To achieve a more open and comfortable landing, we introduced a curve in the staircase design.
And now, here it is.
During House Warming of A Project..!